We maintain templates for a variety of equipment inspection and test processes, often referred to as Inspection and Test Reports (ITRs).

These are intended to be used by contractors as a base-line guide for:

  • Demonstrating the minimum evidence of compliance with our required design standards, construction quality and operational safety requirements, and
  • Provision of asset characteristics and performance details on new equipment, for the purposes of registration of the new asset data in our asset management, operations and financial systems.

The templates should be used as a guide to the minimum inspection, testing and asset information required to be delivered for asset handover.

If the contractor wishes to use their own ITRs and ITPs, they must at minimum include the criteria described in the templates for the relevant assets. In this case the ITRs / ITPs will need to be submitted to us for approval before use.

Note: The list of ITRs and ITPs does not cover all possible asset types. Where no ITR / ITP is listed but the contract requires one to be delivered the contractor will need to submit the proposed ITRs / ITPs for approval by us before use.

The templates should be used in conjunction with the Contract Specifications, our Design Standards, Strategic Product Specifications and the Water Services Association of Australia (WSAA) Codes.

Disclaimer

Please read the following disclaimer before referencing these documents.

Any person or entity which relies upon the Template Inspection and Test Reports & Procedures from the Water Corporation website does so entirely at their own risk and without any right of recourse to the Water Corporation, including, but not limited to, using the Template Inspection and Test Reports & Procedures for works other than for or on behalf of the Water Corporation. The Template Inspection and Test Reports & Procedures available from the Water Corporation website are intended solely for information only and cannot be relied upon. The Water Corporation accepts no liability for any loss or damage that arises from anything in the Template Inspection and Test Reports & Procedures including (but not limited to) any loss or damage that may arise due to the errors and omissions of any person.

The Water Corporation shall not be responsible, nor liable, to any person or entity for any loss or damage suffered as a consequence of reliance on, or the unlawful use of, or reference to, the Template Inspection and Test Reports & Procedures, including but not limited to the use of any part of the Template Inspection and Test Reports & Procedures without first obtaining prior express written permission from the CEO of the Water Corporation.

Any interpretation of anything in the Template Inspection and Test Reports & Procedures that deviates from specific Water Corporation Project requirements must be referred to the Water Corporation’s project manager and/or commissioning specialist / manager for that particular Project for further direction or agreement.

Inspection, test reports and procedures

You can find the template you are after by using the categories below. Alternatively you can download a zip file containing all the templates below

Caption describing what the table is about for screen readers
Downloads
Electrical - Data Logger - Construction Verification - Inspection and Test Report
Electrical - Data Logger - Pre-Commissioning  - Inspection and Test Report
Electrical - Data Logger - Supply Verification - Inspection and Test Report
Electrical - Magnetic Flow Meter Construction Verification - Inspection and Test Procedure
Electrical - Magnetic Flow Meter - Supply Verification - Inspection and Test Procedure
Electrical - Magnetic Flow Meter - Construction Verification - Inspection and Test Report
Electrical - Magnetic Flow Meter - Pre-Commissioning - Inspection and Test Report
Electrical - Magnetic Flow Meter - Supply Verification - Inspection and Test Report
Electrical - Flow Switch - Construction Verification - Inspection and Test Report
Electrical - Flow Switch - Pre-Commissioning - Inspection and Test Report
Electrical - Flow Switch - Supply Verification - Inspection and Test Report
Electrical - Pressure Indicator - Supply Verification - Inspection and Test Report
Electrical - Pressure Indicator - Construction Verification - Inspection and Test Report
Electrical - Pressure Switch - Construction Verification - Inspection and Test Report
Electrical - Pressure Switch - Pre-Commissioning - Inspection and Test Report
Electrical - Pressure Switch - Supply Verification - Inspection and Test Report
Electrical - Pressure Transmitter - Construction Verification - Inspection and Test Report
Electrical - Pressure Transmitter - Pre-Commissioning - Inspection and Test Report
Electrical - Pressure Transmitter - Supply Verification - Inspection and Test Report
Electrical - Ultrasonic Flow Meter - Construction Verification - Inspection and Test Report
Electrical - Ultrasonic Flow Meter - Pre-Commissioning - Inspection and Test Report
Electrical - Ultrasonic Flow Meter - Supply Verification - Inspection and Test Report
Electrical - Ultrasonic Level Transmitter - Construction Verification - Inspection and Test Report
Electrical - Ultrasonic Level Transmitter - Pre-Commissioning - Inspection and Test Report
Electrical - Ultrasonic Level Transmitter - Supply Verification - Inspection and Test Report
Mechanical - Pressure Indicator - Supply Verification - Inspection and Test Report
Mechanical - Magnetic Flow Meter - Construction Verification - Inspection and Test Report
Mechanical - Magnetic Flow Meter - Supply Verification - Inspection and Test Report

Caption describing what the table is about for screen readers
Downloads
Electrical - Sump Pump - Construction Verification - Inspection and Test Report
Electrical - Sump Pump - Pre-Commissioning - Inspection and Test Report
Mechanical - Air Compressor (Reciprocating) - Construction Verification - Inspection and Test Procedure
Mechanical - Air Compressor (Reciprocating) - Supply Verification - Inspection and Test Procedure
Mechanical - Fan - Construction Verification - Inspection and Test Report
Mechanical - Fan - Pre-Commissioning - Inspection and Test Report
Mechanical - Fan - Supply Verification - Inspection and Test Report
Mechanical - Pump (Bore) - Construction Verification - Inspection and Test Report
Mechanical - Pump (Bore) - Pre-Commissioning - Inspection and Test Report
Mechanical - Pump (Bore) - Supply Verification - Inspection and Test Report
Mechanical - Pump (Dosing) - Construction Verification - Inspection and Test Report
Mechanical - Pump (Dosing) - Pre-Commissioning - Inspection and Test Report
Mechanical - Pump (Dosing) - Supply Verification - Inspection and Test Report
Mechanical - Pump (Centrifugal) - Construction Verification - Inspection and Test Report
Mechanical - Pump (Centrifugal) - Pre-Commissioning - Inspection and Test Report
Mechanical - Pump (Centrifugal) - Supply Verification - Inspection and Test Report
Mechanical - Pump (Positive Displacement) - Supply Verification - Inspection and Test Report
Mechanical - Pump (Submersible) - Construction Verification - Inspection and Test Report
Mechanical - Pump (Submersible) - Pre-Commissioning - Inspection and Test Report
Mechanical - Pump (Submersible) - Supply Verification - Inspection and Test Report
Mechanical - Pump (Sump) - Construction Verification - Inspection and Test Report
Mechanical - Pump (Sump) - Pre-Commissioning - Inspection and Test Report
Mechanical - Pump (Sump) - Supply Verification - Inspection and Test Report
Mechanical - Pump - Self-Priming (including Grit Pump) - Pre-Commissioning - Inspection and Test Report

Caption describing what the table is about for screen readers
Downloads
Mechanical - Valve (Air) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Air) - Pre-Commissioning - Inspection and Test Report
Mechanical - Valve (Air) - Supply Verification - Inspection and Test Report
Mechanical - Valve (Butterfly) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Butterfly) - Pre-Commissioning - Inspection and Test Report
Mechanical - Valve (Butterfly) - Supply Verification - Inspection and Test Report
Coating - Valve (Butterfly) - Supply Verification - Inspection and Test Report
Mechanical - Valve (Double Check / Non-Return) or (Reduced Pressure Zone (RPZD)) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Double Check / Non-Return) or (Reduced Pressure Zone (RPZD)) - Pre-Commissioning - Inspection and Test Report 
Mechanical - Valve (Double Check / Non-Return) or (Reduced Pressure Zone (RPZD)) - Supply Verification - Inspection and Test Report 
Mechanical - Valve (Gate) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Gate) - Pre-Commissioning - Inspection and Test Report
Mechanical - Valve (Gate) - Supply Verification - Inspection and Test Report
Coating - Valve (Gate) - Supply Verification - Inspection and Test Report
Mechanical - Valve (Check - Nozzle) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Check - Nozzle) - Pre-Commissioning - Inspection and Test Report 
Mechanical - Valve (Check - Nozzle) - Supply Verification - Inspection and Test Report
Mechanical - Valve (Reflux Dual Flap) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Reflux/ Dual Flap) - Pre-Commissioning - Inspection and Test Report 
Mechanical - Valve (Reflux/ Dual Flap) - Supply Verification - Inspection and Test Report
Mechanical - Penstock - Construction Verification - Inspection and Test Report
Mechanical - Penstock - Pre-Commissioning - Inspection and Test Report
Mechanical - Penstock - Supply Verification - Inspection and Test Report
Mechanical - Valve (Globe) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Globe) - Pre-Commissioning - Inspection and Test Report
Mechanical - Valve (Globe) - Supply Verification - Inspection and Test Report
Mechanical - Valve (Sleeve / Needle) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Sleeve / Needle) - Supply Verification - Inspection and Test Report
Mechanical - Valve (Sleeve / Needle) - Pre-Commissioning - Inspection and Test Report
Mechanical - Valve (Rotary) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Rotary) - Pre-Commissioning - Inspection and Test Report
Mechanical - Valve (Rotary) - Supply Verification - Inspection and Test Report
Mechanical - Valve (Solenoid) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Solenoid) - Pre-Commissioning - Inspection and Test report 
Mechanical - Valve (Solenoid) - Supply Verification - Inspection and Test Report
Mechanical - Valve (Pressure Relief) - Construction Verification - Inspection and Test Report
Mechanical - Valve (Pressure Relief) - Pre-Commissioning - Inspection and Test Report
Mechanical - Valve (Pressure Relief) - Supply Verification - Inspection and Test Report
Coating - Valve (Pressure Relief) - Supply Verification - Inspection and Test Report
Mechanical - Valve (Swing Check) - Supply Verification - Inspection and Test Report
Mechanical - Valve (Swing Check) - Pre-Commissioning - Inspection and Test Report
Mechanical - Valve (Swing Check) - Construction Verification - Inspection and Test Report

Caption describing what the table is about for screen readers
Downloads
Mechanical - Air Diffuser - Construction Verification - Inspection and Test Report
Mechanical - Air Diffuser - Pre-Commissioning - Inspection and Test Report
Mechanical - Air Diffuser - Supply Verification - Inspection and Test Report
Mechanical - Bandscreen - Construction Verification - Inspection and Test Report
Mechanical - Bandscreen - Pre-Commissioning - Inspection and Test Report
 Mechanical - Bandscreen - Supply Verification - Inspection and Test Report
Mechanical - Bubble Testing of Air Diffuser - Pre-Commissioning - Inspection and Test Report
Mechanical - Clarifier - Supply Verification - Inspection and Test Report
Mechanical - Retractable Chute - Construction Verification - Inspection and Test Report
Mechanical - Retractable Chute - Pre-Commissioning - Inspection and Test Report
Mechanical - Spirotainer - Construction Verification - Inspection and Test Report
Mechanical - Spirotainer - Pre-Commissioning - Inspection and Test Report
Mechanical - WWTP Clarifier - Construction Verification - Inspection and Test Report
Mechanical - WWTP Clarifier - Pre-Commissioning - Inspection and Test Report
Mechanical - WWTP Clarifier - Supply Verification - Inspection and Test Report
Mechanical - WWTP Grit Trap Agitator - Construction Verification - Inspection and Test Report
Mechanical - WWTP Grit Trap Agitator - Pre-Commissioning - Inspection and Test Report
Mechanical - WWTP Grit Trap Agitator - Supply Verification - Inspection and Test Report
Mechanical - WWTP Grit Washer - Construction Verification - Inspection and Test Report
Mechanical - WWTP Grit Washer - Pre-Commissioning - Inspection and Test Report
Mechanical - WWTP Grit Washer - Supply Verification - Inspection and Test Report
Mechanical - WWTP Inlet Screen - Pre-Commissioning - Inspection and Test Report
Mechanical - WWTP Rotary Screw Press - Construction Verification - Inspection and Test Report
Mechanical - WWTP Rotary Screw Press - Pre-Commissioning - Inspection and Test Report
Mechanical - WWTP Rotary Screw Press - Supply Verification - Inspection and Test Report