Infrastructure contributions
One-off charges are payable when subdividing land to create extra lots that require water and sewer services.
Find out moreFind out the fees relating to the connection of water and fire services, water service relocations and disconnections, and for upgrading or downgrading water services.
Charges relating to connection fees apply only in the Perth Region, except where special circumstances apply where a quote is required.
All connections in non-metropolitan regions must be quoted.
A quote may be required for connections such as water services, fire services, relocations, and downgrading or upgrading a water service in a built up area such as a central business district. Charges will need to be assessed on a case by case basis in these areas due to the costs of traffic management, access and restoration.
2024-25 | |
---|---|
Service size | Water connection fee |
20mm (domestic use only) | $1,782.13 |
25mm | $2,283.66 |
40mm | $4,039.00 |
50mm | $5,436.42 |
80mm | $9,276.09 |
100mm | $9,276.09 |
150mm | $12,193.09 |
Note: Infrastructure contributions apply to water services for multi-residential, non-residential or mixed use developments.
2024-25 | ||
---|---|---|
Service size | Under 500mm | Over 500mm |
20mm | $995.55 | $1,967.53 |
25mm | $1,268.82 | $2,467.98 |
40mm | $2,231.15 | $4,224.40 |
50mm | $2,997.37 | $5,619.67 |
80mm | At cost | $9,460.42 |
100mm | At cost | $9,460.42 |
150mm | At cost | $12,378.48 |
Service | Cost |
---|---|
Downgrade water service | A quote is required and actual costs will be charged. |
Upgrade water service |
Full cost of new service (includes disconnection), infrastructure contributions may also apply. |
Upgrade fire service | Full cost of new service. Disconnection fees also apply if the service is required in a new location. |
2024-25 | |
---|---|
Service activation fee | $210.05 |
2024-25 | |
---|---|
Disconnection of a water or a fire service | $1,265.60 |
2024-25 | |
---|---|
Sub-meter application fee | $127.21 |
Sub-meter supply and install fee (per meter) | $198.96 |
2024-25 | |
---|---|
Meter box and cover (trafficable) | $218.00 |
Meter box - supply and install only, where meter is already below ground level |
$563.96 |
If you would like a quotation of the fees that may apply to your building or water service application, you can either:
One-off charges are payable when subdividing land to create extra lots that require water and sewer services.
Find out moreOptions for strata lots that need individual water meters for each property.